We have built a wide range of structures over the years. Check out some of our most notable and complex projects.

Kresson Rd. over NJ Turnpike

$17.5M Construction Cost
Cherry Hill, NJ

PA Turnpike Widening

$23+ Million Construction Cost
Montgomery County, PA

Commodore Barry Bridge Pier Cap Replacement & Rehab

$20.1M Construction Cost
Bridgeport, NJ

South Street Bridge Reconstruction

$67.4M Construction Cost
Philadelphia County, PA

Commodore Barry Bridge New Ramps

$71.4M Construction Cost
Delaware County, PA

RICHLIEU ROAD BRIDGE DB-229

$7.8M Construction Cost
Bucks County, PA

Design/Build Noise Wall I-95 & I-76

$38.5M Construction Cost
Camden/Burling County, NJ

Clemente Building Repairs

$1.2M Construction Cost
Philadelphia County, PA

Emergency Septa Reconstruction

$3.0M Construction Cost
Montgomery County, PA

PHL Int’l Airport Ramps

$71.0M Construction Cost
Philadelphia County, PA

Market Street El

$41M Construction Cost
Philadelphia County, PA

JFK Blvd. Over Schuykill River

$17.9M Construction Cost
Philadelphia County, PA

Flint Hill Rd. over PA Turnpike

$4.7M Construction Cost
Montgomery County, PA

Design/Build Retaining Walls SR32

$4.0M Construction Cost
Bucks County, PA

Betsy Ross Bridge & I-95 Interchange

$162.0M Construction Cost
Philadelphia County, PA

Kresson Rd. over NJ Turnpike

Owner – The NJ Turnpike Commission
$17.5M Construction Cost

Z
Staged removal of existing 3-span structure and reconstruction of new 2-span structure over 4 lanes of the NJ Turnpike.
Z

15,000 LF of 16” diameter production pipe piles.

Z
2,300 CY of structural concrete.
Z
Design of temporary pedestrian sidewalk overhang to maintain foot traffic.
Z

Integral concrete placement of 20ft tall abutments with 25ft tall battered wingwalls.

Z
Design and install of permanent and temporary sheeting with whalers and tie backs.
Z
Design and install of cantilever pier cap demolition supports.
Z
Long term MPT patterns on the NJ Turnpike.
Z
24/7 vibration and movement monitoring adjacent structures.
Z
Relocation and install of new utilities, drainage structures, guiderail, landscaping, curb, sidewalk, and aprons.
Z
Realignment of local road with full depth roadway reconstruction.
Build Retaining Walls SR32-Main-image

PA Turnpike Widening

Owner – PA Turnpike Commission
I-476 Northeast Extension
MP31.34 to MP37.39
$23+ Million Construction Cost

Z
Replacement of three (3) Turnpike bridges over the local road.
Z
Replacement of a three-span, 450-foot length bridge over Perkiomen creek
Z
4,000 SY new cast-in-place approach slabs.
Z
All completed with multi-staged construction
Z

Structure abutments on a 35-degree skew with 25+foot tall abutments and wing walls.

Z
Perkiomen Creek structure included the installation of concrete piers with 20-foot tall crash walls, 35-foot pier columns, and 90-foot long pier caps; 75 each cast-in-place concrete diaphragms; setting 48 each pre-stressed concrete I-beam 96” tall x 150-foot length.
Z

Subcontractor on a $225M widening project.

Join-us-for-greater-opportunity in the service engineer

Betsy Ross Bridge & I-95 Interchange

Owner – Pennsylvania DOT (SR 0095, Sec. BR0)
$162.0M Construction Cost

Z

Over 36,000 CY of structural concrete and 111,500 LF of steel production piles.

Z

Over 29,000 CY of Engineered Lightweight Foam Concrete.

Z
Construction and widening of the I-95, Betsy Ross bridge, & Aramingo Ave. Interchange.
Z

New 18-span and new 11-span pre-stressed concrete Beam structures over six active lanes of the interstate highway (I-95), I-95 off-ramp, and active railways (Conrail).

Z
Two-staged replacement of 3-span steel plate girder bridge over active railways with a main span length of 190 LF.
Z
Two-staged widening of existing 7-span steel girder bridge over 4 active lanes of local roadways (Aramingo ave) and active railways (Conrail).
Z

Two-staged demolition and widening of existing 11-span superelevated steel girder bridge over the Frankford creek, 4 active lanes of local roadways, and active railways.

Z
Installation of 1,200 LF MSE retaining wall system.
Z

Over 1,500 LF of cast-in-place and precast concrete box sewer with transition, junction, and tide gate chambers.

Z
Column-supported embankment system & load transfer platform system.
Z
Multi-staged maintenance and protection of local and highway traffic.
Z
Replacement of existing concrete sound wall panels and steel posts.
Z
Design/Build ADA curb cut ramps.
build-noise-wall-betsy-rose-bridge-main-image copy

South Street Bridge Reconstruction

Owner – The City of Philadelphia, PA
$67.4M Construction Cost
Ranked No.1 Bridge Project in the COUNTRY

Z

Over 15,000 CY of structural concrete and 23,000 LF of steel production piles.

Z
Main structure length of 2,800 feet.
Z
Aggressive 22-month schedule for the complex structures.
Z

Bridge demolition and reconstruction occurred over three electrified railways (Amtrak, Csx, and Septa), the Schuylkill River, the University of Pennsylvania athletic fields, 4 active lanes of the interstate highway (I-76), and underneath one electrified railway.

Z
Partial bridge demolition and reconstruction of multi-span, pre-stressed concrete spread box Beam bridge exit ramps of I-76.
Z
Construction of a new 12-span steel girder bridge.
Z
Construction of new pile-supported piers and abutments.
Z
Construction of new river piers on existing foundations.
Z
Construction of ornamental railings, custom gazebos, and LED panel lighting.
South Street Bridge Reconstruction-main-image

Commodore Barry Bridge New Ramps

Owner – Pennsylvania Dot (SR 8018, SEC. Cas)
$71.1M Construction Cost

Z
Over 21,000 CY of structural concrete and 24,000 LF of steel production piles.
Z

New piers up to 80 feet tall.

Z

Included the construction of a 1.6 million pound cast-in-place concrete pier cap.

Z
2,750 LF, 24-span widening of the commodore Barry bridge.
Z
1,400 LF construction of an 8-span continuous composite curved steel girder bridge.
Z
1,500 LF construction of a 10-span continuous composite curved steel girder bridge.
Z
Single-span composite steel girder bridge.
Z
Mechanically stabilized earth walls.
Z
Commodore Barry bridge structure jacking and bearing.
Commodore Barry Bridge New Ramps-main-image

Richlieu Road Bridge DB-229

Owner – The PA Turnpike Commission
$7.8M Construction Cost

Z

Staged removal and reconstruction of 3-span bridge over 4 lanes of the active PA Turnpike.

Z

2,000+ CY of structural concrete and 3,500 LF of steel production piles.

Z

Design and Installation of Deep Cut Support of Excavation with whalers.

Z
Structure-mounted utility relocation, reconfiguration, and reinstallation.
Z
Full-Depth Roadway Reconstruction.
Flint Hill Road Bridge Main-image

Design/Build Noise Wall I-95 & I-76

Owner – New Jersey Dot
$38.5M Construction Cost

Z

Over 14 Miles of Driscoll design/Build noise wall.

Z

Over 1.5 million square feet of precast architectural concrete panels.

Z
$2.5M of landscaping and site restoration.
Z
Drilled caisson foundations with precast concrete posts.
Z
Reinforced earth retaining walls.
Z
New drainage systems, guide rail, and highway lighting.
Design/Build Noise Wall I-95 & I-76

Clemente Building Repairs

GC – NorthStar Group Services Inc.
$1.2 Million Construction Cost
Z
Multi-level building concrete slab repair.
Z
Driscoll-formulated repair design.
Z

Multiple repair types of varying depth and complexity.

Z
Installation of custom-designed scaffolding supports.
Z
Repairs to column concrete crowns, caps, and capitals.
Z

Installation of custom increasing radial rebar.

Z
Drilled and dowelled steel pins.
GC – NorthStar Group Services Inc

Emergency Septa Reconstruction

Owner – Southeastern Pennsylvania Transportation Authority
$3.0M Construction Cost

Z
Existing 2-span structure completely destroyed by overnight flooding.
Z
Driscoll was selected to perform the emergency reconstruction.
Z
Construction schedule of 30 days.
Z
Demolition of existing structure and construction of new 3-span, 114-foot structure with new catenaries.
Z

Completed ahead of schedule and within 23 work days.

Z
Drilled shaft foundations with rock sockets. Driscoll selected Foundation Structures, Inc. To install the drilled shafts.
Z
Gabion abutment construction.
Emergency Septa Reconstruction-main-image

PHL Int'l Airport Ramps

Owner – Pennsylvania DOT (SR 0095, Sec. AIR)
$71.0M Construction Cost

Z
New Phila. International airport access ramps from I-95.
Z
5-span superelevated curved steel girder bridge over I-95 NB, I-95 SB, and airport access roads.
Z
6-span pre-stressed concrete beam structure over access roads and local roads.
Z
2-span pre-stressed concrete beam over I-95 NB.
Z
2EA, 2-span steel girder bridge over I-95 NB, I-95 SB, and airport access roads.
Z
Retained elevated roadway with incorporated MSE walls.
Z
Pier cofferdam installation.
PHL Airport Ramps-main-image

Market Street El

Owner – Southeastern Pennsylvania Transportation Authority
$41M Construction Cost

Z

Installation of 147 foundations and piers for the “EL” elevated rail line.

Z
Reconstruction of existing duct banks.
Z
Custom-designed trench box shoring systems.
Z
Work areas directly under the existing rail line.
Z

Limited overhead working room.

Z
Multi-staged maintenance and protection of traffic.
Z
Protection and relocation of underground and overhead utilities.
Z
Control and minimization of vibration activities.
Market Street El-main-image

JFK Blvd. Over Schuylkill River

Owner – Pennsylvania DOT (SR 3037, Sec. PBJ)
$17.9M Construction Cost

Z

Two-staged deck reconstruction of JFK boulevard bridge over the Schuylkill river.

Z

Multi-staged deck reconstruction of Schuylkill avenue west bridge over 4 lanes of the active interstate highway (I-76).

Z
Pier column jackets and bearing pedestal concrete restoration.
Z
Cleaning and repainting of the steel superstructure.
Z

Bridge jacking and bearing replacements.

Z
Construction of concrete stair towers leading to the Schuylkill trail.
Z
Reconfiguration of AMTRAK’s 30th street station access roads.
Z
New bridge roadway and marine navigational lighting.
JFK Blvd-Over Schuylkill River1

Flint Hill Rd. over PA Turnpike

Owner – The PA Turnpike Commission
$4.65M Construction Cost

Z

Full bridge demolition and reconstruction over 4 lanes of the active highway (PA turnpike).

Z
Reconstruction of a single-span steel girder bridge.
Z
Deep-cut support of excavation design and installation.
Z
Full-depth roadway reconstruction.
Z
Installation of water and telecommunication utilities.
Z
Construction of concrete sidewalks and stormwater inlets.
Flint Hill Road Bridge Main-image

Design/Build Retaining Walls SR32

Owner – Pennsylvania DOT (SR 032, Sec. FL6)
$3.7M Construction Cost

Z

Driscoll Design/Build of 3 retaining walls.

Z
Utilized galvanized steel posts with precast concrete panels.
Z
Existing structure deemed deficient due to flooding.
Z

Total new wall length of 1,865 feet.

Z
Removal of existing flood-damaged solid pile walls.
Z
Guide rail, stormwater inlets, and pipes.
Z
Roadway reconstruction.
Z
River road flood recovery project 6.
Build Retaining Walls SR32-Main-image

Commodore Barry Bridge Pier Cap Replacement & Rehab

Owner – The Delaware River Port Authority
$20.1M Construction Cost

Z
Design and installation of temporary bridge supports and jacking structures
Z

Selective removal and replacement of 12 concrete hammerhead pier caps under heavy traffic flow

Z

Wire sawing and robotic demolition of existing pier caps

Z

Design of custom support sled for pier cap rebar cage and cap formwork install

Z

Replaced 10,000 LF of existing downspouts and scuppers

Z

9,0000 SF of type 2 concrete repairs

Z

Included repairs to the river pier columns and caps 150 ft above the Delaware River

Z

Over 400,000 SF of substructure concrete protective coatings

Z

MPT patterns across the Commodore Barry Bridge

Build Retaining Walls SR32-Main-image